Wembley · HA0, HA9
Full Refurbishments in Wembley
Strip-out to final decoration — rewires, replumbs, new heating, structural alterations, kitchens, bathrooms and finishes, run as one programme by one team.
Refurbishments go wrong when trades are booked piecemeal and nobody owns the sequence. We run the whole programme: strip-out, structural work, first fix, plaster, second fix, decoration, in the right order with the right gaps for drying. You get one contact and one schedule rather than chasing six subcontractors.
Full Refurbishments in Wembley: what to know locally
Interwar semis and terraces, with a significant amount of converted and multi-occupancy housing, plus newer development around the stadium.
Wembley has a high proportion of rental and multi-occupancy property, so a lot of our work here is landlord-side: reconfiguration, fire separation, HMO-standard work and turnaround refurbishments between tenancies.
Planning authority: Brent Council. Brent operates an additional HMO licensing scheme across much of the borough, and has specific standards for room sizes, fire separation and amenities that reconfiguration work has to meet.
What the work covers
- Full strip-out and waste management
- Rewire and consumer unit upgrade
- Replumb, new boiler and heating system
- Structural alterations and steel
- Plastering, joinery and flooring
- Kitchens, bathrooms and decoration
What it costs
A full refurbishment of a three-bedroom house generally runs £1,400 to £2,200 per square metre depending on how much structural work is involved and the specification of the finishes.
Other work we do in Wembley
Full Refurbishments nearby
Full Refurbishments in Wembley — questions
Do you cover Wembley?
Yes — Wembley and the HA0, HA9 postcodes are part of our core working area, along with Harrow, Kensal, Greenford. Being local means a site visit within days rather than weeks.
Which council handles planning for Wembley?
Brent Council. Brent operates an additional HMO licensing scheme across much of the borough, and has specific standards for room sizes, fire separation and amenities that reconfiguration work has to meet.
Do I need to move out during a full refurbishment?
For a whole-house job, usually yes — there are periods with no water, no heating and no working kitchen. It also speeds the programme up considerably. For phased work room by room, staying is often workable.
How long does a whole-house refurbishment take?
A three-bedroom house is typically 12 to 20 weeks depending on structural work and how quickly decisions on finishes come back. Delays are far more often about choosing tiles than about the building work.
Can you work from an architect's drawings?
Yes, and we would rather you had them for anything structural. If you do not have drawings we can bring in an architect and a structural engineer as part of the package.
Full Refurbishments in Wembley?
Tell us about the property and what you have in mind. We will come out, measure it properly, and put a written itemised quote in front of you.
We reply to every quote request within 24 hours.