Skip to content
LC London Constructions BUILDERS · WEST LONDON London Constructions home

Greenford · UB6

Full Refurbishments in Greenford

Strip-out to final decoration — rewires, replumbs, new heating, structural alterations, kitchens, bathrooms and finishes, run as one programme by one team.

Refurbishments go wrong when trades are booked piecemeal and nobody owns the sequence. We run the whole programme: strip-out, structural work, first fix, plaster, second fix, decoration, in the right order with the right gaps for drying. You get one contact and one schedule rather than chasing six subcontractors.

Full Refurbishments in Greenford: what to know locally

Largely 1930s semi-detached suburban housing with consistent plot sizes, plus later post-war development.

Very consistent housing stock, which makes pricing predictable and programmes reliable. The standard 1930s semi here takes a hip-to-gable loft conversion and a rear extension well, and the original driveways are typically at the end of their life.

Planning authority: Ealing Council. Greenford retains permitted development rights across most of its suburban stock, with limited conservation coverage, so rear extensions and loft conversions are often achievable without a full planning application.

What the work covers

  • Full strip-out and waste management
  • Rewire and consumer unit upgrade
  • Replumb, new boiler and heating system
  • Structural alterations and steel
  • Plastering, joinery and flooring
  • Kitchens, bathrooms and decoration

What it costs

A full refurbishment of a three-bedroom house generally runs £1,400 to £2,200 per square metre depending on how much structural work is involved and the specification of the finishes.

Other work we do in Greenford

Full Refurbishments nearby

Full Refurbishments in Greenford — questions

Do you cover Greenford?

Yes — Greenford and the UB6 postcodes are part of our core working area, along with Ealing, Harrow, Hanwell. Being local means a site visit within days rather than weeks.

Which council handles planning for Greenford?

Ealing Council. Greenford retains permitted development rights across most of its suburban stock, with limited conservation coverage, so rear extensions and loft conversions are often achievable without a full planning application.

Do I need to move out during a full refurbishment?

For a whole-house job, usually yes — there are periods with no water, no heating and no working kitchen. It also speeds the programme up considerably. For phased work room by room, staying is often workable.

How long does a whole-house refurbishment take?

A three-bedroom house is typically 12 to 20 weeks depending on structural work and how quickly decisions on finishes come back. Delays are far more often about choosing tiles than about the building work.

Can you work from an architect's drawings?

Yes, and we would rather you had them for anything structural. If you do not have drawings we can bring in an architect and a structural engineer as part of the package.

Full Refurbishments in Greenford?

Tell us about the property and what you have in mind. We will come out, measure it properly, and put a written itemised quote in front of you.

We reply to every quote request within 24 hours.