Skip to content
LC London Constructions BUILDERS · WEST LONDON London Constructions home

Shepherd's Bush · W12, W14

Full Refurbishments in Shepherd's Bush

Strip-out to final decoration — rewires, replumbs, new heating, structural alterations, kitchens, bathrooms and finishes, run as one programme by one team.

Refurbishments go wrong when trades are booked piecemeal and nobody owns the sequence. We run the whole programme: strip-out, structural work, first fix, plaster, second fix, decoration, in the right order with the right gaps for drying. You get one contact and one schedule rather than chasing six subcontractors.

Full Refurbishments in Shepherd's Bush: what to know locally

Victorian terraces, many already converted into flats, together with pockets of larger housing around Askew Road and Wendell Park.

Flat conversions are everywhere here, which means a lot of the work involves sound separation between units, communal areas and freeholder approval. Rear extensions to ground floor flats need the freeholder on board before anything else happens.

Planning authority: Hammersmith & Fulham Council. Hammersmith & Fulham applies conservation designation around Wendell Park and Askew Road. Loft conversions in terraces need care over the party wall and the shared roof structure.

What the work covers

  • Full strip-out and waste management
  • Rewire and consumer unit upgrade
  • Replumb, new boiler and heating system
  • Structural alterations and steel
  • Plastering, joinery and flooring
  • Kitchens, bathrooms and decoration

What it costs

A full refurbishment of a three-bedroom house generally runs £1,400 to £2,200 per square metre depending on how much structural work is involved and the specification of the finishes.

Other work we do in Shepherd's Bush

Full Refurbishments nearby

Full Refurbishments in Shepherd's Bush — questions

Do you cover Shepherd's Bush?

Yes — Shepherd's Bush and the W12, W14 postcodes are part of our core working area, along with Hammersmith, Acton, Kensal. Being local means a site visit within days rather than weeks.

Which council handles planning for Shepherd's Bush?

Hammersmith & Fulham Council. Hammersmith & Fulham applies conservation designation around Wendell Park and Askew Road. Loft conversions in terraces need care over the party wall and the shared roof structure.

Do I need to move out during a full refurbishment?

For a whole-house job, usually yes — there are periods with no water, no heating and no working kitchen. It also speeds the programme up considerably. For phased work room by room, staying is often workable.

How long does a whole-house refurbishment take?

A three-bedroom house is typically 12 to 20 weeks depending on structural work and how quickly decisions on finishes come back. Delays are far more often about choosing tiles than about the building work.

Can you work from an architect's drawings?

Yes, and we would rather you had them for anything structural. If you do not have drawings we can bring in an architect and a structural engineer as part of the package.

Full Refurbishments in Shepherd's Bush?

Tell us about the property and what you have in mind. We will come out, measure it properly, and put a written itemised quote in front of you.

We reply to every quote request within 24 hours.