Chiswick · W4
Full Refurbishments in Chiswick
Strip-out to final decoration — rewires, replumbs, new heating, structural alterations, kitchens, bathrooms and finishes, run as one programme by one team.
Refurbishments go wrong when trades are booked piecemeal and nobody owns the sequence. We run the whole programme: strip-out, structural work, first fix, plaster, second fix, decoration, in the right order with the right gaps for drying. You get one contact and one schedule rather than chasing six subcontractors.
Full Refurbishments in Chiswick: what to know locally
High-value Victorian and Edwardian terraces and semis, including the Bedford Park estate and the grid streets off Chiswick High Road.
Chiswick properties carry high values, so the specification expectation is correspondingly high — sash window matching, proper brick selection and detailing that stands up to close inspection. Much of the area sits in conservation designation.
Planning authority: Hounslow Council. Hounslow applies strict conservation controls across much of Chiswick, and Bedford Park in particular has detailed design guidance. Anything affecting the front elevation almost always needs permission.
What the work covers
- Full strip-out and waste management
- Rewire and consumer unit upgrade
- Replumb, new boiler and heating system
- Structural alterations and steel
- Plastering, joinery and flooring
- Kitchens, bathrooms and decoration
What it costs
A full refurbishment of a three-bedroom house generally runs £1,400 to £2,200 per square metre depending on how much structural work is involved and the specification of the finishes.
Other work we do in Chiswick
Full Refurbishments nearby
Full Refurbishments in Chiswick — questions
Do you cover Chiswick?
Yes — Chiswick and the W4 postcodes are part of our core working area, along with Acton, Hammersmith, Ealing. Being local means a site visit within days rather than weeks.
Which council handles planning for Chiswick?
Hounslow Council. Hounslow applies strict conservation controls across much of Chiswick, and Bedford Park in particular has detailed design guidance. Anything affecting the front elevation almost always needs permission.
Do I need to move out during a full refurbishment?
For a whole-house job, usually yes — there are periods with no water, no heating and no working kitchen. It also speeds the programme up considerably. For phased work room by room, staying is often workable.
How long does a whole-house refurbishment take?
A three-bedroom house is typically 12 to 20 weeks depending on structural work and how quickly decisions on finishes come back. Delays are far more often about choosing tiles than about the building work.
Can you work from an architect's drawings?
Yes, and we would rather you had them for anything structural. If you do not have drawings we can bring in an architect and a structural engineer as part of the package.
Full Refurbishments in Chiswick?
Tell us about the property and what you have in mind. We will come out, measure it properly, and put a written itemised quote in front of you.
We reply to every quote request within 24 hours.