Hanwell · W7
Bathroom Fitting in Hanwell
Complete bathrooms, en-suites and wet rooms — tanked and waterproofed correctly, so you are not revisiting it in three years.
The failure in most bathrooms is not visible: tanking skipped behind the tiles, a shower tray bedded badly, or waste pipework without enough fall. We tank wet areas properly, pressure-test before tiling, and set falls correctly, because the cost of getting this wrong is ripping out a finished room.
Bathroom Fitting in Hanwell: what to know locally
Victorian and Edwardian terraces and semis, with 1930s housing towards Boston Manor and larger properties near Churchfields.
Hanwell sits on relatively generous plots for the price point, which makes it good ground for rear extensions and loft conversions on properties where the budget would not stretch in Ealing or Chiswick. Older stock often has solid walls and benefits from external insulation.
Planning authority: Ealing Council. Parts of Hanwell including the Golden Manor and Churchfields areas carry conservation designation. The Victorian stock frequently has solid walls, making external wall insulation worth considering alongside other work.
What the work covers
- Strip-out and waste removal
- First fix plumbing and new waste runs
- Tanking and waterproofing to wet areas
- Underfloor heating and towel rails
- Full tiling, floor and wall
- Sanitaryware, screens and extraction
What it costs
A full bathroom refit is typically £6,500 to £12,000 depending on sanitaryware, tiling and whether the layout moves. A wet room with a formed floor costs more than a tray.
Other work we do in Hanwell
Bathroom Fitting nearby
Bathroom Fitting in Hanwell — questions
Do you cover Hanwell?
Yes — Hanwell and the W7 postcodes are part of our core working area, along with Ealing, Greenford, Acton. Being local means a site visit within days rather than weeks.
Which council handles planning for Hanwell?
Ealing Council. Parts of Hanwell including the Golden Manor and Churchfields areas carry conservation designation. The Victorian stock frequently has solid walls, making external wall insulation worth considering alongside other work.
How long does a bathroom take?
Usually two to three weeks for a full refit. Tanking and tile adhesive both need curing time and rushing those is exactly how a bathroom fails early.
Can you move the toilet?
Often, but it depends on reaching the soil stack with adequate fall. Where that is not possible a macerator is an option, though we would rather re-route the waste where the building allows it.
What is tanking and do I need it?
A waterproof membrane applied behind the tiles in wet areas. Tiles and grout are not waterproof on their own. In a shower enclosure or wet room it is essential, and we do it as standard.
Bathroom Fitting in Hanwell?
Tell us about the property and what you have in mind. We will come out, measure it properly, and put a written itemised quote in front of you.
We reply to every quote request within 24 hours.